hippylove.org

Independent intelligence · Evidence-first research

Global Intelligence Tracker

Follow the money. Map the technology. Understand the connections.

Starter registry, not a comprehensive or real-time database. Organisation listings do not imply military involvement. Financial and capacity figures are blank unless sourced. Verify records against their linked sources before publication or decision-making.

Main interactive world atlas

Global infrastructure and energy map

Explore geolocated data centres, AI compute, drones, satellites, launch sites, rare earths, magnets, semiconductors, minerals, power generation and electricity grids. Filter by industry and import sourced capacity and country-energy datasets.

Open the Global Intelligence World Map →

Geolocated starter evidence; worldwide numeric completeness requires curated datasets.

Explore the connected landscape

—starter directory records
9research views
0verified facility-capacity records loaded

Navigate sectors, search companies, import sourced CSV records and explore explicitly documented relationships. The world infrastructure map is the primary geographic view. The spending map remains a supporting sub-section.

Open the military expenditure map →

Military expenditure & procurement

Explore country spending in the existing annual map. Procurement must be tracked separately from expenditure, with contract stage, amount, currency, source and award date to avoid double counting.

Open the existing country map and spending table →

Registered drone & autonomous-systems companies

Company profiles, jurisdiction, manufacturer/developer role, ownership, investors, products, civilian/defence use and verified contracts. The starter directory is not a legal-registration verification service.

Data centres: server size & global growth

Track facilities and operators separately. Essential metrics: physical servers, AI accelerators/GPUs, IT power (MW), facility power (MW), floor area (m²), status, opening date, capital expenditure and sources. Operator-level profiles below do not establish individual facility capacity.

ServersInstalled units
GPUsAI accelerators
IT MWCompute power
Facility MWTotal site power
m²Floor area

No facility size, energy consumption or investment totals are inferred from operator names. Import facility-level evidence using the CSV template.

AI infrastructure & compute suppliers

Hardware suppliers, AI-cloud operators, compute capacity, energy requirements, ownership and verified government or defence contracts.

Satellite manufacturers & operators

Constellations, operational satellites, communications and Earth-observation capabilities, investors, government contracts and documented dual-use relationships.

Launch companies & space infrastructure

Rocket families, launch providers, spaceports, annual launches, payload capacity, reusable systems, customer missions and procurement. Launch counts and success rates require dated source records.

Search all company intelligence

Import sourced research

Upload a CSV with the supplied column headers. Import stays in your browser session; no data is sent to the server. Imported records are clearly marked and do not modify the public registry.

Connections explorer

Ownership, investors, supply relationships and government contracts should be connected only through verifiable evidence. The initial graph is deliberately empty until relationship-level sources are supplied.

No independently verified relationship records have been loaded. Import records with parent_company or contract_reference, and verify them before treating them as established links.

Verified developments feed

Designed for new procurement awards, drone registrations, data-centre expansions, satellite orders and launches. A dated, sourced feed requires a maintained ingestion pipeline and editorial verification; this version does not claim live monitoring.

No verified dated news entries have been ingested yet.

Methodology & limitations

Each dataset must carry its observation date, publisher, source URL, verification status and definition. Proposed facilities are not operating facilities; power capacity is not electricity consumption; accelerators are not servers; contracts are not expenditure; dual-use does not mean military use. The directory is illustrative, not exhaustive.